Resultados de la búsqueda
-
Conservation Measure Conservation Measure 41-02 (2011)
period from 1 May to 31 August in each season, or until the catch limit is reached, whichever is sooner ...
Conservation Measure : 41-02 (2011)
-
Conservation Measure Conservation Measure 41-02 (2013)
period from 16 April to 31 August in each season, or until the catch limit is reached, whichever is ...
Conservation Measure : 41-02 (2013)
-
Conservation Measure Conservation Measure 41-10 (2017)
2017/18 season is defined as the period from 1 December 2017 to 31 August 2018. 4. The exploratory ...
Conservation Measure : 41-10 (2017)
-
Conservation Measure Conservation Measure 185/XVIII (1999)
1999/2000 fishing season to the north of 60°S is defined as the period from 1 March to 31 August 2000 ...
Conservation Measure : 185/XVIII (1999)
-
Conservation Measure Conservation Measure 90/XIV (1995)
harvest regime up to 30 June in any split-year shall be submitted to CCAMLR by 31 August of the ...
Conservation Measure : 90/XIV (1995)
-
Conservation Measure Conservation Measure 41-02 (2014)
period from 16 April to 31 August in each season, or until the catch limit is reached, whichever is ...
Conservation Measure : 41-02 (2014)
-
Conservation Measure Conservation Measure 41-09 (2018)
2018 to 31 August 2019. Fishing operations 5. The exploratory longline fishery for Dissostichus ...
Conservation Measure : 41-09 (2018)
-
Conservation Measure Conservation Measure 82/XIX (2000)
: Human occupation of the site during the period 1 June to 31 August is not permitted except under ... occupation of these structures is not permitted during the period 1 June to 31 August (see Section D.1(c ...
Conservation Measure : 82/XIX (2000)
-
Conservation Measure Conservation Measure 91-02 (2004)
during the period 1 June to 31 August is not permitted except under emergency circumstances. (d) In ... permitted during the period 1 June to 31 August (see Section D.1(c)). (c) New structures are not ...
Conservation Measure : 91-02 (2004)
-
Conservation Measure Conservation Measure 41-09 (2017)
defined as the period from 1 December 2017 to 31 August 2018. Fishing operations 5. The exploratory ...
Conservation Measure : 41-09 (2017)