Résultats de la recherche
-
Conservation Measure Conservation Measure 8/VI (1987)
A, B and C. 2. At the end of each reporting period, each Contracting Party shall obtain from each ...
Conservation Measure : 8/VI (1987)
-
Conservation Measure Conservation Measure 16/VIII (1989)
periods are hereinafter referred to as periods A, B, C, D, E and F. 2. At the end of each reporting ...
Conservation Measure : 16/VIII (1989)